

The cylinder block leak test mahcine is developed, designed and manufactured in accordance with relevant national mandatory standards. It is suitable for various functional and performance tests as well as type tests of cylinder valves. The equipment is widely used in cylinder valve manufacturers, research institutes, testing institutions and other places.
Function and Features of the Gas Cylinder Valve Test Bench
1. The control components use servo motors and imported torque sensors to control the opening and closing of the valve. The impact is small and the control is stable.
2. The test process is controlled by a microcomputer, and the pressure-time curve, test pressure values, etc. are displayed in real time. The test results can be automatically saved and can also be printed out. The test results can be automatically saved even after power loss.
3. Computer data acquisition and processing, printing output of environmental/medium temperature, cycle count and cycle pressure waveform;
4. The opening and closing torque stroke of the gas cylinder valve can be set.
5. During the test, you can freely set the number of running cycles required. Once the requirement is met, the test will automatically stop.
6. It has a power-off protection function. In the event of a power outage, the system will automatically release pressure and terminate the test, thereby providing the utmost protection for the safety of the operators and the equipment.
7. In case of leakage of the test piece, an alarm point can be set. Once the leakage volume reaches a certain level, the system will automatically trigger an alarm and stop operating. However, the computer will still remain powered on.
1. Technical parameters: The rated pressure of this equipment is 20-30 Mpa; the reserved air inlet size is ZG1/4; the bottle valve thread is 18*1.5; 4 stations.
2. The above quotations include 17% value-added tax, freight charges and packaging fees.
3. Delivery time: 10 to 12 working days after the payment is made.
4. One-year warranty and lifetime service.
Fill the water tank completely and manually screw the valve to be calibrated onto the cylinder valve test interface.
Copyright © 2008 by Shenzhen Lori Technology Co.,Ltd. All Rights Reserved
Hello, please leave your name and email here before chat online so that we won't miss your message and contact you smoothly.